How many reps should I hire next quarter, and in what order?
Do the arithmetic backwards from the number. Take next year's new ARR target, divide by realistic per rep yield, then divide again by the attainment you actually expect, which for most teams is around 70 percent of quota capacity, and you have your headcount. Then subtract the ones you already have, add back for attrition, and pull the start dates forward by the ramp period, so a rep who needs to produce in Q3 has to start in Q1. Order matters: AEs before SDRs, a sales engineer before your fourth AE if the demo is technical, and RevOps the moment you cannot answer a pipeline question in ten minutes.
Go deeper
5 resources, 5 link-checked.
📄 Article
✓ Link checkedFreeAdvanced
The headcount question answered as arithmetic: revenue target divided by revenue per rep and capacity utilisation, with ramp time and attrition built in. Use it before you sign off next quarter's hiring plan.
The clearest arithmetic anywhere on rep economics: the rule of 10 for quota against base, four months to productivity, draws during ramp, and why teams attain about 70 percent of quota capacity so you must plan over capacity.
365 B2B companies surveyed on ramp, tenure, attrition, activity and comp. When you want to know whether your ramp is slow or your attrition is normal, this is the reference everyone quotes.
Names the two ways founders get the timing wrong, scaling too early and scaling too late, and walks the progression from founder selling to pods to a real team. Useful precisely when you are deciding whether it is time.
Seven minutes that show the arithmetic on screen: target, per rep yield, expected attainment, ramp, attrition. Watch it once and you can build your own hiring plan in a spreadsheet the same afternoon.